Depots lost weeks per turnaround. Technical orders spanned 40 years across three incompatible document systems, logs were hand-keyed from paper, and the facility sat behind an air gap.
Retrieval, not inference. Technicians lost 30–70 minutes to search over scanned PDFs with no semantic layer and no route to a hosted vector store from inside the SCIF.
Everything moved inside the perimeter: FP8 GGUF weights on local vLLM, a hybrid BM25 + HNSW index on depot storage, and egress pinned to drop_all at the kernel.